A Maintenance Crane Was Required Above An Operating Batch-House, But Structural Records Were Incomplete. The Proposed Orientation Restricted Useful Reach And The Supplied Crane Interface Did Not Match The Existing Supporting Steel.

WHAT HAD TO BE PROVED

The Revised Base And Existing Supporting Steel Could Carry The Reactions After The Crane Was Rotated For Useful Maintenance Reach.

Hand calculations remained the design basis. A local finite-element model covered the new base plate, gussets and the first length of supporting steel—not the whole building. Its purpose was to examine load introduction that code formulae represent coarsely: local plate bending, weld-toe hot spots and whether the existing web required a stiffener.

LOAD INTRODUCTION / REVISED CRANE BASE
LOCAL MODEL EXTENT

Column → plate → gussets → beam web and flanges → supporting connection and anchors

CHECK
PURPOSE
STATUS AFTER REVISION
Hand calculations
PURPOSE
DESIGN BASIS
Local shell model
Plate bending and load introduction
CHECKED
Weld detail review
Load path and weld-toe sensitivity
REVISED
Existing beam web
Need for local stiffening
CHECKED
Fabrication interface
Fit to verified existing steel
REVISED
WHAT THE ANALYSIS CHANGED
Crane Rotated. Plate Enlarged. Load Transfer Gusseted. Interface Redesigned To The Steel That Was Actually There.